Open /critical-path on an Agency Web UI server and select a saved execution.
This view analyzes finalized historical trace files. It does not subscribe to
the live trajectory stream. Existing logs and Perfetto-compatible exports remain
the source of the evidence.
Agency already collected model attempts and canonical exchanges, permission-hook tool timing, orchestration envelopes, ptrace supervision, process/cgroup measurements, OpenTelemetry, and SQLite/Perfetto history. The earlier causal projection scoped tool IDs and prompt fingerprints correctly, but its historical normalizer omitted orchestration/process spans, its global view could not follow cross-agent producer IDs, and saved process measurements often lacked tool ownership. The dedicated profiler reuses those collectors and fixes the missing identity boundaries rather than replacing their measurement pipeline.
The overview separates recorded wall time, the longest known dependency chain, measured contributions to that chain, unexplained dependency intervals, aggregate observed activity across agents, and wall time outside measured operations. Temporal coverage does not establish complete causality: even 100% measured coverage remains qualified if the recording cannot prove the execution boundary and all dependencies.
The initial timeline shows the path and its recorded cross-agent dependency context. LLM, tool, waiting, and system observations have separate colors; path contributions have a highlighted outline. Agent identities remain visible in named swimlanes. Unrelated agents retain their lanes and can be opened through Show local activity. All operation activity reveals parallel operations.
Focus an agent, search operation identities, zoom with the buttons or Ctrl/Cmd and the wheel, and drag blank space to pan. Select a span or dependency line to inspect its timing, evidence classification, identity, and available metrics. Expand a tool’s attributed process overlays to inspect process generations, ancestry, CPU, memory, and I/O evidence. Process overlays never increase the tool’s wall duration. Recorded agent-owned processes without a known owning tool remain independently inspectable.
Detailed evidence links open the existing historical trajectory and Systems, LLM, or Tools profiler. Download the original trace and open it in external Perfetto for deeper investigation. Agency does not upload the trace to Perfetto.
Missing fields remain unavailable. Read Coverage and limitations before treating a partial or candidate path as an explanation of the entire workload. Results, commands, and other displayed text are bounded previews; source transcripts remain in the existing detailed investigator.
agprof.trace.json and
summary.json beside profile_data.sqlite3 and agent logs.All trace span/sample positions use the recorded perf_counter_ns axis. The
loader preserves the original first-span origin and follows explicit parent
span IDs through dropped harness wrappers to recover request ownership.
SQLite wall-clock event timestamps never create monotonic trace dependencies.
Cross-agent blocking links require a recorded shared clock.
| Relationship | Accepted evidence | Meaning |
|---|---|---|
| Model → tool | Tool-use ID scoped to the emitting exchange and agent; explicit model ID when present | Issuance dependency |
| Tool → next model | Canonical prompt tool-result identity scoped to its issuer | Result consumption dependency |
| Model → next model | Canonical response fingerprint/lineage present in the consuming prompt | Continuation; older history is provenance |
| Producer request → consumer request | Persisted Future/result-handle or context-chain producer request ID | Producer completion gates consumer admission or dependency wait completion |
| Workers → result barrier | wait_all records every producer request ID |
Fan-in; workers remain parallel |
| Span parent → child | Exact parent span identity | Containment/provenance; no automatic blocking claim |
| Tool → process | Exact invocation ID, explicit owning tool ID, or generation-qualified process identity | Resource attribution; no added tool duration |
| Agent → sampled process | Explicit sandbox ownership | Agent attribution only; does not establish a tool owner |
| Process → child process | Recorded parent process generation identity | Ancestry/provenance |
Runtime result and context handles retain private execution identity after
their Future resolves. Those fields do not enter serialized task data. Request
dependencies are recorded on request/phase spans and in request_dependencies
events, including dependencies already completed when submitted. Result wait
spans record all awaited producers and the consumer execution, when available.
Synchronous submission spans additionally record launcher serialization within
the same caller execution, thread, and profiling session. A later submission
depends on the preceding submission returning; workers remain concurrent.
This captures cold launch/setup overhead without linking the preceding worker’s
completion to the next worker. Serial native tools carry exact predecessor
invocation IDs within a unique response batch; external tools receive no
unrecorded serial ordering.
Native Bash/grep/glob subprocess roots report process lifetimes through the existing profiling bridge. Ptrace spans capture PID namespace, namespace PID, start ticks, and parent information. The sampler stores PID/start-tick process generations and generation-qualified ancestry. A host PID alone never maps a container process or a reused PID to a tool. Short-lived processes may have a recorded lifetime but no resource sample.
The graph uses start/end boundary vertices. Measured operation intervals are weighted edges; explicit/reconstructed blocking dependencies connect their boundaries. A topological longest-path calculation validates endpoints, finite timestamps, temporal direction, and weights. Cyclic blocking evidence makes the path unavailable. Malformed links are reported and excluded, never reversed or repaired silently.
Request submission and engine execution envelopes act as boundary gates rather than billable work. A process under a tool supplies inspection evidence rather than another additive duration. Nested intervals remain competing paths, and aggregate activity uses interval unions per agent. Independent agents never get edges from their overlap and their durations never sum into global wall time.
At a recorded fan-in, only the tail after the latest recorded prerequisite is charged as unexplained elapsed dependency time. Earlier branches are not charged for another worker’s execution. Equal elapsed chains prefer measured model/tool evidence over a containing wait. Gaps establish timing, not their resource cause.
The latest observed prerequisite of a join is also reported separately as a join gate. If a late-starting worker has no recorded startup dependency, a different earlier worker can have a longer known chain. The profiler discloses that discrepancy and identifies the latest recorded completion without manufacturing the late worker’s missing earlier history. A join gate is timing evidence about the recorded prerequisite set; it is not proof that all required workers or the entire workload boundary were captured.
The core topological analysis is O(V + E). Identity correlation and presentation sorting add indexing/sort costs. Per-agent paths use partitioned nodes and edges. Resource queries use generation-qualified series and binary searches of bounded recorded sample positions. Whole-process CPU/I/O totals are never allocated to a tool by interval overlap. Reduced sample extrema are observations, not an exact integral or a guaranteed peak for every subinterval. Sandbox pressure and I/O windows match an explicit sandbox identity and retain their shared scope. They are context for an operation or agent, rather than resources exclusively owned by a tool.
| Endpoint | Result |
|---|---|
GET /api/critical-path/runs |
Allowlisted historical run catalog; no local trace paths or synthetic demo entries |
GET /api/critical-path/{id} |
Compact summary, operations, dependency edges, agents, processes, coverage, and evidence links |
GET /api/critical-path/{id}?limit=20000 |
Additional compact span summaries; initial limit is 5,000 |
GET /api/critical-path/{id}/operations/{operation_id} |
Recorded operation and its relationships/process context |
The loader caps semantic spans at 50,000 and explicit ancestry entries at 100,000, disclosing omissions. Counters retain bounded extrema rather than every sample, with at most 4,096 series and 250,000 retained sample points. Native observer JSONL histories are streamed with the same semantic span limit. Trace and canonical block-reference retention each have a 250,000-reference budget; incomplete prompt histories cannot create active consumption edges. Projected unmeasured tool observations share the 50,000-operation graph budget. A single JSON event over 32 MiB is rejected explicitly. Oversized optional summaries and canonical blocks remain unavailable with a coverage warning. Truncated or malformed trace documents return an analysis error.
Two compact results are cached. Trace, summary, canonical database, and WAL revisions invalidate that cache. A lock prevents simultaneous requests from retaining duplicate analyses. The API bounds response operations, edges, agents, and processes and reports omitted counts. Critical/blocking relationships take priority. The browser renders at most 240 operation marks and 400 dependency edges per page, culls offscreen marks, and expands processes on demand.
Deterministic tests cover sequential LLM/tool chains, process attribution, namespace/PID reuse, nested timing, independent agents, fan-out/fan-in, request admission gates, resource window measurements, missing timing, temporal contradictions, cycles, loader boundaries, payload limits, and frontend filtering. Recorded agprof/orchestrator tests save and reload actual concurrent executions and native process observations. Real SWE-bench Agency traces are also analyzed.
Historical runs cannot acquire dependencies or process ownership that were never recorded. Agent parentage alone does not establish delegation completion, and unrecorded agent messages do not establish data dependencies. Retry labels and errors remain evidence; identical prompts alone do not prove a retry dependency. No process contention, scheduler causality, syscall bottleneck cause, or hypothetical speedup is inferred. Sampling may miss short processes, and a process’s sampled bounds are not its exact birth/exit unless lifecycle spans were captured. Resource pressure/network details are available only where existing instrumentation recorded them.
An exported trace is a completed recording, not proof that its workload succeeded. Interrupted spans and absent ends remain incomplete. Where no exact workload start/end is available, recorded wall time is the trace/session extent. Large traces still require a full streaming scan on the first request, and very large prompt histories can make identity correlation more expensive than the core DAG algorithm. No persisted analysis index is introduced in this version.
| Changed area | Files |
|---|---|
| Historical graph and analysis | agwebui/critical_path.py, agwebui/causal_graph.py |
| Compact historical storage/API | agwebui/critical_path_store.py, agwebui/critical_path_api.py, agwebui/server.py, agwebui/investigator.py |
| Dedicated view | static/critical-path.html, critical-path.css, critical-path.js, critical-path-model.js, critical-path-ui.js; navigation in static/index.html and static/investigator.js |
| Requests and synchronization | orchestrator/orchestrator.py, orchestrator/scheduler.py, agdata.py, agcontext.py |
| Model/tool reporting | engine/host_servers/llm_handler_server.py, host_interaction_server.py, native_harness/react_loop.py |
| Process/resource reporting | native_harness/profiling.py, native_harness/tools.py, harness/ptrace/supervisor.py, profiler/agprof.py, profiler/presentation.py |
| Tests | tests/agwebui/test_critical_path.py, test_critical_path_store.py, critical-path.test.mjs, tests/test_critical_path_instrumentation.py |
| Documentation | This guide, guides/profiling.md, architecture/observability.md |
Paths in the table are relative to agency/observability/ for agwebui and
profiler, to agency/ for runtime areas, and to the repository root for tests.
Validation on 2026-10-14 included 362 passing web/backend/recorded-runtime tests
with one environment skip, 255 passing broader runtime/profiler regressions,
and all 17 frontend test files, including 13 dedicated UI cases. The final
dedicated backend/loader/instrumentation suite passed all 78 tests, including
explicit non-finite JSON rejection and optional-source size guards. Ruff and scoped
git diff --check passed.
Actual browser QA used the recorded three-agent SWE-bench executions under
runs/tutorials/20261010T212937... and
runs/tutorials/20261014T110057.338608Z_swebench_three_psf__requests-6028/.
The latter 63.5 MB trace contained 135,160 events and reduced to 139 retained
spans / 142 projected operations. A scan with Python allocation tracing took
3.37 seconds and peaked at 22.9 MB of newly tracked Python allocations after
imports; this is not a total-process RSS measurement. Its 72.69-second candidate
chain in a 100.41-second recording had 51.02 seconds of measured contributions
and disclosed missing historical cross-agent and tool/process ownership.
The larger browser recording exposed 827 operations and 685 processes.
Fresh saved/reloaded Agency sessions validate new cross-agent and launcher
correlations, a forced cold submission delay, native serial tool batches,
generation-qualified real CPU subprocess samples, absent samples, and
namespace/PID reuse. These tests use recorded timings and actual orchestrator
and subprocess execution with deterministic model fixtures; the browser QA
uses historical model workloads. Scan artifacts are retained under
artifacts/critical-path/implementation-validation/.